A neutral, engineering-focused incoming quality control (IQC) method for empty vape hardware. It combines AQL sampling[1], dimensional/torque checks, draw-resistance benchmarks informed by e-vapour testing practice[6], sealing criteria, basic electrical checks aligned to lithium-cell safety frameworks[2][3][4], and documentation/traceability with RoHS/REACH material controls[5].
1) What to Verify on Arrival
1.1 Packaging, Labeling & Lot Identity
- Outer cartons: intact, dry, orientation/fragile labels, no odor/contamination. Capture photos of any shock/tilt indicators.
- Inner trays: count vs. packing list, protective caps/films present, no loose components.
- Lot data: supplier lot, mfg date, line/shift (if provided), and a traceable QR/2D on cartons & inner packs mapped to your receipt ID.
1.2 Sampling Plan (AQL)
Adopt an attributes acceptance sampling plan per ISO 2859-1 / ANSI-ASQ Z1.4[1]. Use General Inspection Level II (default), switching rules for normal ↔ tightened ↔ reduced. Define defect classes upfront:
- Critical (CR): safety risks/total malfunction (e.g., exposed battery tabs, cracked insulators, severe leak path).
- Major (MA): functional failure (e.g., mouthpiece does not lock within torque window; ΔP out of spec).
- Minor (MI): cosmetic or small fit variance without functional impact.
2) Dimensional & Mechanical Checks
2.1 Gauging & Tolerances
- Critical dims: body OD, mouthpiece stem OD, seal-groove width/depth, connector length; verify against drawing tolerances (e.g., ±0.05 mm on mating features).
- Visual: burrs at mouth-contact, snap-fit cracks, flash at seals, thread damage, foreign particles.
2.2 Mouthpiece Fit & Torque Window
Use a calibrated torque driver. Define a closure window (e.g., 0.15–0.30 N·m for specific snap/quarter-turn designs—replace with drawing values). Record first-lock and re-lock torques; flag >10% CV as process variation.
2.3 Logistics Robustness
- Perform a light ISTA-style handling simulation (corner/edge/flat drops ≈ 76 cm on 1 carton); re-inspect random units for cracks/misalignment/loosened caps.
- After long transit, re-check airflow and sealing on cartons with most handling marks.
3) Airflow / Draw-Resistance & Sealing
3.1 Draw-Resistance Benchmark
Set a target ΔP at a defined flow/puff regime informed by e-vapour methods (e.g., CORESTA/CRM terminology)[6]. Use a fixed fixture, tubing ID/length, and environment. Example ranges (illustrative):
| Profile | Flow / Puff | Target ΔP (Pa) | Tolerance |
|---|---|---|---|
| MTL (tight) | 12–15 L/h, 3 s | 1200–1600 | ±200 |
| MTL (medium) | 15–17 L/h, 3 s | 900–1200 | ±200 |
| RDL (looser) | 18–20 L/h, 3 s | 600–900 | ±150 |
Lock your own targets via field data, then validate bench repeatability (see Gage R&R).
3.2 Sealing / Leak Screening — Quantified
- Static vacuum hold: apply −3.0 ±0.2 kPa at the reservoir path for 30 s; acceptance: ≤150 Pa decay (illustrative—set your product limits).
- Mass-gain check: pre-condition at 25 °C/50% RH for 2 h; after a controlled preheat, no visible condensate in sensor cavity and mass gain <= 10 mg (fixture-dependent).
- Seal compression review: verify gasket compression set window (design-specific) and surface finish at leak paths (threads, press-fits).
4) Basic Electrical & Charging Safety
- OCV window: receive at 3.6–3.9 V typical (follow supplier spec); quarantine outliers.
- Internal resistance: spot-check to detect aging/damage; track mean & CV by lot.
- USB-C/PD behavior: verify charge current limit, termination voltage, and BMS protections (OCP/OTP/OVP). Document behavior with PD vs. non-PD adapters.
- Transport readiness: confirm UN 38.3 (T.1–T.8) reports for the exact cell/pack[3] and apply current IATA DGR PI 965–970 when shipping by air[4].
5) Documentation, Traceability & Materials
- COA alignment: metals/elastomers/plastics declarations aligned with RoHS and REACH duties (SVHC communication as required)[5].
- Lot genealogy: supplier lot → IQC sub-lot → production order; store label/QR photos and carton anomalies.
- NCR/CAPA: defect class & counts, 8D actions, supplier response SLA (e.g., 5 business days).
- Change control: for material/tooling/firmware changes, request PPAP-style evidence or First Article with focused tests.
6) Measurement Quality (Gage R&R & Uncertainty)
Before locking any specification window (e.g., ΔP tolerance, torque), confirm the measurement system is capable:
- Gage R&R: aim for %StudyVar < 10% for critical characteristics; 10–30% may be acceptable with process controls. Document operators, parts, trials, and ANOVA results.
- Uncertainty budget: list dominant contributors (sensor accuracy, tubing losses, ambient), estimate combined standard uncertainty, and ensure tolerance >= 5× total measurement uncertainty for reliable decisions.
- Calibration: maintain current certificates for pressure sensors, flow meters, torque drivers, calipers/micrometers.
7) Downloadable Templates
Need editable versions? Reply to this post or contact your rep to receive:
- Incoming QC Checklist (.xlsx)
- Draw-Resistance Bench Record (.xlsx)
- NCR / 8D Template (.docx)
- Supplier Change Notification Intake (.docx)

1 Comments
This is exactly what I was looking for.